18K Gold Pink Amethyst and Sky Blue Topaz Diamond Dangle Necklace
18K Gold Plated Silver 1/8 Cttw Diamond Hammered Cross Medallion Earrings
18K Gold Plated Silver Diamond Fleur Di Lis Medallion Bangle Bracelet
18K Rose and White Gold 1 7/8 Cttw Diamond Textured Dome Cocktail Ring
18K Rose Gold 1 1/2 Cttw Diamond Flower Composite Leverback Earrings
18K Rose Gold 1.00 Cttw Diamond Multi Row Dome Band Ring
18K Rose Gold 1.25 Cttw Diamond Spider Web Teardrop Dangle Earrings
18K Rose Gold 1.50ctw Diamond and 7mm Cushion Amethyst Statement Studs
18K Rose Gold 1/2 Cttw Brown Diamond and Pink Sapphire Cascade Necklace
18K Rose Gold 1/2 CTTW Composite Diamond Oval Halo Engagement Ring
18K Rose Gold 1/2 Cttw Diamond and Freshwater Pearl Double Strand Necklace
18K Rose Gold 10mm Cushion Aquamarine and 1 1/8 Cttw Diamond Halo Ring
18K Rose Gold 11mm Amethyst Clover Halo Diamond Stud Earrings
18K Rose Gold 13 1/5 Cttw Diamond Micro-Pave Sculptural Omega Earrings
18K Rose Gold 2 1/5 Cttw Black and White Diamond 6 Row Band Ring
18K Rose Gold 3/4 Cttw Diamond and Amethyst Heart Pendant Necklace
18K Rose Gold 3/4 Cttw Diamond Cuban Chain Huggie Earrings
18K Rose Gold 6.90 Cttw Pave Diamond Inside Out Eternity Hoop Earrings
18K Rose Gold 8 1/3 Cttw Pear Diamond Floral Omega Earrings
18K Rose Gold Diamond and Freshwater Pearl Blossom Stud Earrings
18K Rose Gold Diamond and Green Tsavorite Graduated Curved Choker Necklace
18K Rose Gold Green Tsavorite Cluster Snake Pendant Necklace 18
18K Rose Gold Lemon and Smoky Quartz Diamond Halo Dangle Drop Earrings
18K Rose Gold Red and Blue Enamel 1/2 Cttw Diamond Pave Band Ring
Bijoux-NYC Direct brings together fine jewelry guidance, customer support, sizing help, shipping and return details, special offers, collaborations...
Have an account? Log in to check out faster.
1/10 Cttw Round and Baguette Diamond Mosaic Square Pendant in 10K Gold
1/2 Carat Diamond Bezel Solitaire Necklace in 10K Rose Gold
1/2 Carat Diamond Bezel Solitaire Necklace in 10K Yellow Gold
1/2 Carat Diamond S-Curve Tennis Bracelet in 14K Gold Plated Silver